Your Position:Home>News>Industry news>Requirements for Gas Generator Room and Gas Pipeline

Requirements for Gas Generator Room and Gas Pipeline

Date:2025-06-20

With the continuous increase in the proportion of gas-fired power generation in the energy field due to its clean and efficient advantages, ensuring the safe and stable operation of the units has become the primary concern of users. As a professional service provider of comprehensive solutions for gas power generation, Shandong Supermaly Power Generation Equipment Co., Ltd. is well aware that a standardized and safe computer room environment and gas pipeline system are the cornerstone of ensuring efficient power generation. The core requirements for the gas generator room and pipelines are summarized as follows:

1Professional computer room environment requirements:

Safety first: The computer room must strictly comply with national explosion-proof and fire prevention regulations (such as GB50058), use explosion-proof electrical equipment and lighting systems, equip with complete combustible gas leakage alarm devices and linked ventilation systems, and ensure timely warning and disposal.

Ventilation guarantee: Design sufficient intake and exhaust systems to ensure fresh air required for unit combustion, and efficiently discharge high-temperature exhaust gases and potential leakage gases to maintain a safe operating environment.

Space layout: Reserve sufficient space for equipment installation, daily maintenance, and emergency operations, and keep the passage unobstructed.

2Requirements for gas pipeline system:

Reliable materials: Pipes and valves must be made of specialized materials that meet the characteristics of the gas medium (such as seamless steel pipes), have corresponding pressure rating qualifications, and ensure long-term pressure safety.

Standardized construction: The entire process of pipeline welding, connection, and laying must comply with standards such as the "Code for Design of Urban Gas" (GB50028-2020), and be constructed and accepted by a qualified team to eliminate the risk of leakage.

Security guarantee: The system must be equipped with an emergency shut-off valve, which is linked with a leak alarm device to achieve rapid gas shutdown; The pipeline needs to be clearly marked, reliably grounded to prevent static electricity, and a regular leak detection mechanism should be planned.

Professional commitment in Supermaly:

As a trusted provider of gas power generation solutions, Shandong Supermaly Power Equipment Co., Ltd. provides a full process service from rigorous site evaluation, compliant machine room design, pipeline system optimization to professional installation and commissioning, personnel training, and after-sales maintenance. We ensure that your gas-fired power generation project meets the highest safety and efficiency standards, safeguarding your stable operation!

 

Choosing Supermaly means choosing a safe and efficient gas power guarantee!

News